Day five: Windows and doors
The final wall went up, and openings for the windows and doors are roughed in.
Then, we headed out to pick up the doors, and purchase the final lumber needed for roofing, which will have a 15 degree slope. We will also be installing a motion detector and outlets in the shed, so we picked up some wiring and switches.
New materials purchased/used: 100 ft 14/2 outdoor copper wiring, drip edges, furring strips, 8 2x4s, lighting and switch casings = $127.22
Labor hours: 3-4.
Adventures in Michigan!
12 years ago
No comments:
Post a Comment