Hilltowne Hollow has undertaken its first major joint project: the construction of a greenroof bike shed. Given that we're located in a flood zone, any effort we can make to reduce runoff from the rain will benefit the property. In addition to a greenroof, we may eventually install rain barrels too.
Inspired in part by this
Raleigh-based greenroof, work on the shed began this week.
Several months ago, we purchased a pile of two-by-fours at the
ReStore for $20. Last week, we picked up $200 worth of plywood sheets for free from
freecycle.
Day one: Clearing the site.
Ironically, the first step to building our greenroof bike shed is to cut down a tree and clear the brush. We weren't particularly attached to all pine trees growing on our lot, and selected the shed footprint based on minimizing large and hardwood tree removal, as well as maximizing light to the roof and to my living room window. :)
My friend's truck, "Georgia Grace," was on hand to move the brush into our backyard where we will eventually burn and/or chip it for mulch. We stocked up on graham crackers, chocolate and marshmallows in case of the former.
Within an hour, the site was clear:
Next, we marked out a 10'x10' area (to support a 12'x12' floor) and placed nine cement blocks, (reclaimed from our crawlspaces) on the ground, making sure they were level:
New materials purchased/used: 0. Labor hours: 3-4. Cost of s'mores ingredients: $10.
Day two: Building the foundation.
Using discount coupons for Lowe's, we purchased lumber to build the foundation. Within 3 hours, the floor was complete. To ensure that the structure wouldn't slide off the blocks, we dug a few holes and "staked" with a couple posts.
Nailguns are the secret weapon. Oh yeah.
New materials purchased/used: 12 2x6s, 3 4x4s = $133.23
Labor hours: 3-4.